UNKNOWN110817

Substation-Adjacent

Yadkin County, North Carolina · PJM

DC Readiness
57.0
Good / 100

UNKNOWN110817 is a substation-adjacent datacenter candidate site in Yadkin County, North Carolina, interconnecting through PJM. It screens at 57.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110817
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance49.8 mi
Fiber providers6
Fiber coverage89.4%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance93.7 mi

Site characteristics

Parcel ownerBryant Juanita
Parcel APN498000674826
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index77.7 (avg 100)

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance49.8 mi
Nearest rail2.8 mi
Nearest gas pipeline30.5 mi
Nearest fiber route76.5 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.45¢/kWh
Industrial electricity10.10¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,239

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power15%
35
Fiber connectivity12%
73
Energy cost10%
82
Water risk8%
84
Natural hazard8%
58
Buildability7%
45
Labor market4%
50
DC cluster4%
45
Land / acreage3%
45
Construction cost3%
85
Gas pipeline2%
2
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Yadkin County, ranked by DC Readiness.

Sites near UNKNOWN110817
SiteTypeVoltageCapacityQueue waitScore
MITCHELL RIVERSubstation-Adjacent230 kV300 MW4.3 yrs67.2
Greenfield (UNKNOWN115091 - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs61.0
UNKNOWN110816Substation-Adjacent100 kV50 MW4.3 yrs61.0
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.8
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.7
UNKNOWN110824Substation-Adjacent100 kV50 MW4.3 yrs59.7
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.4
Greenfield (UNKNOWN115091 - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110817, Yadkin County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.