UNKNOWN114701

Substation-Adjacent

Rowan County, North Carolina · PJM

DC Readiness
58.1
Good / 100

UNKNOWN114701 is a substation-adjacent datacenter candidate site in Rowan County, North Carolina, interconnecting through PJM. It screens at 58.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN114701
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPSegra Kannapolis
IXP distance19.4 mi
Fiber providers9
Fiber coverage52.2%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance118.5 mi

Site characteristics

Parcel ownerDUKE ENERGY CAROLINAS, LLC
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteBROWN STREET AUTOMOTIVE
Hazard sub-score23/100
Construction cost index87.3 (avg 100)

Location context

Nearest datacenterSegra Kannapolis
DC distance19.4 mi
Nearest rail0.5 mi
Nearest gas pipeline4.9 mi
Nearest fiber route0.5 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.94¢/kWh
Industrial electricity7.05¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,780

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
35
Fiber connectivity12%
33
Energy cost10%
82
Water risk8%
87
Natural hazard8%
23
Buildability7%
45
Labor market4%
50
DC cluster4%
65
Land / acreage3%
59
Construction cost3%
77
Gas pipeline2%
84
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Rowan County, ranked by DC Readiness.

Sites near UNKNOWN114701
SiteTypeVoltageCapacityQueue waitScore
WOODLEAF SWITCHING STATIONSubstation-Adjacent500 kV1,000 MW4.3 yrs73.5
Greenfield (WOODLEAF SWITCHING STATION - M)Greenfield500 kV1,000 MW4.3 yrs69.6
Greenfield (PLEASANT GARDEN - WOODLEAF SWI)Greenfield500 kV1,000 MW4.3 yrs68.1
Greenfield (WOODLEAF SWITCHING STATION - M)Greenfield500 kV1,000 MW4.3 yrs67.2
TAP169920Substation-Adjacent230 kV300 MW4.3 yrs66.4
UNKNOWN114688Substation-Adjacent100 kV50 MW4.3 yrs65.6
TAP169914Substation-Adjacent100 kV50 MW4.3 yrs65.0
UNKNOWN114692Substation-Adjacent100 kV50 MW4.3 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN114701, Rowan County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.