Iredell, North Carolina · PJM

DC Readiness
63.8
Good / 100

TAP154206 is a substation-adjacent datacenter candidate site in Iredell, North Carolina, interconnecting through PJM. It screens at 63.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP154206
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPSegra Kannapolis
IXP distance23.9 mi
Fiber providers11
Fiber coverage54.1%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance122.6 mi

Site characteristics

Parcel ownerCity Of Statesville
Parcel APN4755316325.000
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index90.0 (avg 100)

Location context

Nearest datacenterSegra Kannapolis
DC distance23.9 mi
Nearest rail2.1 mi
Nearest gas pipeline0.2 mi
Nearest fiber route83.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.97¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$7,124

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power15%
35
Fiber connectivity12%
70
Energy cost10%
94
Water risk8%
84
Natural hazard8%
58
Buildability7%
92
Labor market4%
50
DC cluster4%
65
Land / acreage3%
52
Construction cost3%
75
Gas pipeline2%
100
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Iredell, ranked by DC Readiness.

Sites near TAP154206
SiteTypeVoltageCapacityQueue waitScore
Greenfield (MCGUIRE - ANTIOCH)Greenfield500 kV1,000 MW4.3 yrs65.0
Greenfield (MCGUIRE - ANTIOCH)Greenfield500 kV1,000 MW4.3 yrs64.8
UNKNOWN169761Substation-Adjacent100 kV50 MW4.3 yrs64.2
UNKNOWN114317Substation-Adjacent100 kV50 MW4.3 yrs63.5
UNKNOWN114340Substation-Adjacent100 kV50 MW4.3 yrs63.1
UNKNOWN114319Substation-Adjacent100 kV50 MW4.3 yrs63.0
TAP154181Substation-Adjacent100 kV50 MW4.3 yrs62.9
Greenfield (UNKNOWN114916 - MARSHALL STEAM)Greenfield230 kV300 MW4.3 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154206, Iredell. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.