UNKNOWN132944

Substation-Adjacent

Morris County, New Jersey · NYISO

DC Readiness
70.3
Excellent / 100

UNKNOWN132944 is a substation-adjacent datacenter candidate site in Morris County, New Jersey, interconnecting through NYISO. It screens at 70.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132944
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zoneNYISO_CAPITL
Wholesale LMP$55.47/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionNYISO
Queue depth426
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPCologix NNJ2
IXP distance1.2 mi
Fiber providers14
Fiber coverage94.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance203.9 mi

Site characteristics

Parcel ownerJERSEY CENTRAL POWER & LT CO
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteHANOVER TWP OF DPW
Hazard sub-score62/100
Construction cost index118.9 (avg 100)

Location context

Nearest datacenterCologix NNJ2
DC distance1.2 mi
Nearest rail0.8 mi
Nearest gas pipeline1.0 mi
Nearest fiber route70.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$30,022

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
26
Fiber connectivity12%
98
Energy cost10%
58
Water risk8%
90
Natural hazard8%
62
Buildability7%
95
Labor market4%
50
DC cluster4%
100
Land / acreage3%
45
Construction cost3%
51
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Morris County, ranked by DC Readiness.

Sites near UNKNOWN132944
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132392Substation-Adjacent230 kV300 MW3.0 yrs75.2
UNKNOWN132619Substation-Adjacent500 kV1,000 MW3.5 yrs69.5
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs69.5
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs68.8
UNKNOWN132302Substation-Adjacent230 kV300 MW3.0 yrs68.3
UNKNOWN132303Substation-Adjacent230 kV300 MW3.5 yrs67.8
Greenfield (PORTLAND STATION - UNKNOWN1636)Greenfield230 kV300 MW3.0 yrs67.1
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN132944, Morris County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.