Stone County, Missouri · MISO

DC Readiness
63.8
Good / 100

TAP153766 is a substation-adjacent datacenter candidate site in Stone County, Missouri, interconnecting through MISO. It screens at 63.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP153766
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance30.3 mi
Fiber providers4
Fiber coverage2.4%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance337.2 mi

Site characteristics

Parcel ownerEMPIRE DISTRICT ELECTRIC CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index61.3 (avg 100)

Location context

Nearest datacenterBluebird Underground Data Center
DC distance30.3 mi
Nearest rail5.3 mi
Nearest gas pipeline21.7 mi
Nearest fiber route79.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.22¢/kWh
Industrial electricity9.34¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,003

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
48
Energy cost10%
91
Water risk8%
89
Natural hazard8%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
99
Gas pipeline2%
30
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Stone County, ranked by DC Readiness.

Sites near TAP153766
SiteTypeVoltageCapacityQueue waitScore
TABLE ROCK DAM POWER STATIONSubstation-Adjacent161 kV100 MW1.4 yrs61.1
UNKNOWN117445Substation-Adjacent161 kV100 MW1.4 yrs60.9
UNKNOWN117413Substation-Adjacent161 kV100 MW1.4 yrs60.8
UNKNOWN117626Substation-Adjacent161 kV100 MW1.4 yrs60.5
UNKNOWN117615Substation-Adjacent161 kV100 MW1.4 yrs60.5
Greenfield (UNKNOWN117387 - UNKNOWN117616)Greenfield161 kV100 MW1.4 yrs58.1
UNKNOWN117616Substation-Adjacent161 kV100 MW1.4 yrs57.5
Greenfield (NIXA SOLAR, LLC - TABLE ROCK D)Greenfield161 kV100 MW1.4 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153766, Stone County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.