UNKNOWN117621

Substation-Adjacent

Ray County, Missouri · MISO

DC Readiness
64.8
Good / 100

UNKNOWN117621 is a substation-adjacent datacenter candidate site in Ray County, Missouri, interconnecting through MISO. It screens at 64.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117621
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance29.3 mi
Fiber providers6
Fiber coverage70.3%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance174.3 mi

Site characteristics

Parcel ownerKCP&L GREATER MISSOURI OPERATIONS CO.
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score37/100
Construction cost index67.5 (avg 100)

Location context

Nearest datacenterLightEdge Kansas City Subtropolis (KCI1)
DC distance29.3 mi
Nearest rail1.2 mi
Nearest gas pipeline5.8 mi
Nearest fiber route35.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.50¢/kWh
Industrial electricity8.89¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,276

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
71
Energy cost10%
89
Water risk8%
91
Natural hazard8%
37
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
47
Construction cost3%
94
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Ray County, ranked by DC Readiness.

Sites near UNKNOWN117621
SiteTypeVoltageCapacityQueue waitScore
Greenfield (SIBLEY - OVERTON (345KV))Greenfield345 kV600 MW1.4 yrs66.7
UNKNOWN117591Substation-Adjacent161 kV100 MW1.4 yrs66.0
UNKNOWN117544Substation-Adjacent161 kV100 MW1.4 yrs65.6
SibleyBrownfield524 MW1.4 yrs63.8
Greenfield (UNKNOWN117591 - UNKNOWN117621)Greenfield161 kV100 MW1.4 yrs61.7
Greenfield (UNKNOWN117426 - MAURER LAKE)Greenfield161 kV100 MW1.4 yrs60.8
Greenfield (UNKNOWN117426 - MAURER LAKE)Greenfield161 kV100 MW1.4 yrs60.5
Greenfield (UNKNOWN117591 - UNKNOWN117621)Greenfield161 kV100 MW1.4 yrs59.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117621, Ray County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.