THOMAS HILL STATION (345KV)

Substation-Adjacent

Randolph County, Missouri · MISO

DC Readiness
72.0
Excellent / 100

THOMAS HILL STATION (345KV) is a substation-adjacent datacenter candidate site in Randolph County, Missouri, interconnecting through MISO. It screens at 72.0/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTHOMAS HILL STATION (345KV)
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance110.6 mi
Fiber providers6
Fiber coverage80.5%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance177.6 mi

Site characteristics

Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index89.4 (avg 100)

Location context

Nearest datacenterCarfax
DC distance31.0 mi
Nearest rail0.9 mi
Nearest gas pipeline0.6 mi
Nearest fiber route114.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.99¢/kWh
Industrial electricity8.38¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,578

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
48
Fiber connectivity12%
72
Energy cost10%
89
Water risk8%
88
Natural hazard8%
62
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
48
Construction cost3%
76
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Randolph County, ranked by DC Readiness.

Sites near THOMAS HILL STATION (345KV)
SiteTypeVoltageCapacityQueue waitScore
TAP138792Substation-Adjacent161 kV100 MW1.4 yrs67.6
Greenfield (UNKNOWN117844 - THOMAS HILL ST)Greenfield345 kV600 MW1.4 yrs66.6
TAP153233Substation-Adjacent161 kV100 MW1.4 yrs66.4
UNKNOWN120966Substation-Adjacent161 kV100 MW1.4 yrs66.2
Greenfield (UNKNOWN117844 - THOMAS HILL ST)Greenfield345 kV600 MW1.4 yrs66.0
TAP138790Substation-Adjacent161 kV100 MW1.4 yrs65.9
Greenfield (UNKNOWN117844 - THOMAS HILL ST)Greenfield345 kV600 MW1.4 yrs65.6
UNKNOWN117195Substation-Adjacent161 kV100 MW1.4 yrs65.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for THOMAS HILL STATION (345KV), Randolph County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.