Jackson County, Missouri · MISO

DC Readiness
68.2
Good / 100

TAP138928 is a substation-adjacent datacenter candidate site in Jackson County, Missouri, interconnecting through MISO. It screens at 68.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138928
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPIron Mountain Data Center - Kansas City (KCM-1)
IXP distance2.7 mi
Fiber providers14
Fiber coverage89.3%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance169.0 mi

Site characteristics

Parcel ownerEvergy
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteRENTAL SERVICE CORP
Hazard sub-score52/100
Construction cost index112.1 (avg 100)

Location context

Nearest datacenterIron Mountain Data Center - Kansas City (KCM-1)
DC distance2.7 mi
Nearest rail0.4 mi
Nearest gas pipeline2.6 mi
Nearest fiber route5.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.55¢/kWh
Industrial electricity8.01¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$6,658

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
94
Energy cost10%
90
Water risk8%
89
Natural hazard8%
52
Buildability7%
45
Labor market4%
50
DC cluster4%
100
Land / acreage3%
59
Construction cost3%
57
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jackson County, ranked by DC Readiness.

Sites near TAP138928
SiteTypeVoltageCapacityQueue waitScore
SIBLEYSubstation-Adjacent345 kV600 MW1.4 yrs73.5
HAWTHORNESubstation-Adjacent345 kV600 MW1.4 yrs72.9
UNKNOWN117111Substation-Adjacent161 kV100 MW1.4 yrs72.0
STATION ISubstation-Adjacent161 kV100 MW1.4 yrs72.0
UNKNOWN121754Substation-Adjacent161 kV100 MW1.4 yrs71.8
UNKNOWN117657Substation-Adjacent161 kV100 MW1.4 yrs71.5
BLUE VALLEYSubstation-Adjacent161 kV100 MW1.4 yrs71.4
TAP138930Substation-Adjacent161 kV100 MW1.4 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138928, Jackson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.