Skip to content
Gridcensus

DeKalb County, Missouri · MISO

DC Readiness
61.2
Good / 100

FAIRPORT is a substation-adjacent datacenter candidate site in DeKalb County, Missouri, interconnecting through MISO. It screens at 61.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFAIRPORT
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionMISO
Queue depth39
Avg queue wait2.8 yrs

Connectivity

Nearest IXPLincoln Rackhouse Kansas City
IXP distance52.2 mi
Fiber providers3
Fiber coverage88.2%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterCenturyLink
DC distance25.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.02¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,456

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
46
Fiber connectivity12%
43
Energy cost10%
50
Water risk8%
88
Natural hazard8%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in DeKalb County, ranked by DC Readiness.

Sites near FAIRPORT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117593Substation-Adjacent161 kV100 MW2.8 yrs55.7
UNKNOWN119996Substation-Adjacent161 kV100 MW2.8 yrs54.9
UNKNOWN119994Substation-Adjacent69 kV50 MW2.8 yrs53.8
UNKNOWN117654Substation-Adjacent69 kV50 MW2.8 yrs53.0
UNKNOWN117553Substation-Adjacent69 kV50 MW2.8 yrs53.0
UNKNOWN118655Substation-Adjacent69 kV50 MW2.8 yrs52.2
Curnow Chevrolet Building SiteIndustrial2.8 yrs52.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FAIRPORT, DeKalb County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.