MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING)

Manufacturing

Tunica County, Mississippi

DC Readiness
49.6
Fair / 100

MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING) is a manufacturing datacenter candidate site in Tunica County, Mississippi. It screens at 49.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Avg queue wait3.5 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance35.3 mi
Fiber providers6
Fiber coverage24.9%

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterxAI Macrohardrr
DC distance29.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.77¢/kWh
Industrial electricity7.19¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,274

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Tunica County, ranked by DC Readiness.

Sites near MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING)
SiteTypeVoltageCapacityQueue waitScore
TUNICASubstation-Adjacent230 kV300 MW2.8 yrs56.4
UNKNOWN111260Substation-Adjacent230 kV300 MW2.8 yrs55.6
HAMBRICKSubstation-Adjacent115 kV100 MW2.8 yrs52.7
UNKNOWN110931Substation-Adjacent115 kV100 MW2.8 yrs51.2
Greenfield (TUNICA - ROBINSONVILLE)Greenfield230 kV300 MW2.8 yrs50.3
DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing3.5 yrs49.3
Greenfield (RITCHIE STATION - TUNICA)Greenfield230 kV300 MW2.8 yrs47.1
Greenfield (UNKNOWN111255 - TUNICA)Greenfield115 kV100 MW2.8 yrs44.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING), Tunica County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.