UNKNOWN110256

Substation-Adjacent

George, Mississippi · MISO

DC Readiness
62.1
Good / 100

UNKNOWN110256 is a substation-adjacent datacenter candidate site in George, Mississippi, interconnecting through MISO. It screens at 62.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110256
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth13
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX New Orleans (EDCSLI01)
IXP distance81.5 mi
Fiber providers6
Fiber coverage93.5%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance496.4 mi

Site characteristics

Parcel ownerJrl-Lpc Inc
Parcel APN0304 -17-0- 004. 00
Land owner typeprivate
Buildability85.0/100
Land cover (NLCD)Barren Land

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index82.8 (avg 100)

Location context

Nearest datacenterEdgeConneX New Orleans (EDCSLI01)
DC distance81.5 mi
Nearest rail1.8 mi
Nearest gas pipeline2.1 mi
Nearest fiber route59.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.78¢/kWh
Industrial electricity8.91¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,441

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
59
Fiber connectivity12%
43
Energy cost10%
85
Water risk8%
90
Natural hazard8%
55
Buildability7%
85
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
81
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in George, ranked by DC Readiness.

Sites near UNKNOWN110256
SiteTypeVoltageCapacityQueue waitScore
BENNDALE 230Substation-Adjacent230 kV300 MW1.4 yrs69.0
TAP169444Substation-Adjacent115 kV100 MW1.4 yrs66.3
UNKNOWN156620Substation-Adjacent115 kV100 MW1.4 yrs65.3
TAP143376Substation-Adjacent115 kV100 MW1.4 yrs64.7
SOUTHEAST GREENESubstation-Adjacent230 kV300 MW1.4 yrs64.2
BENNDALE 230Substation-Adjacent161 kV100 MW1.4 yrs63.8
UNKNOWN110319Substation-Adjacent230 kV300 MW1.4 yrs61.9
Greenfield (BARRY - UNKNOWN110319)Greenfield230 kV300 MW1.4 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110256, George. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.