Choctaw County, Mississippi · MISO

DC Readiness
73.4
Excellent / 100

WOLF CREEK is a substation-adjacent datacenter candidate site in Choctaw County, Mississippi, interconnecting through MISO. It screens at 73.4/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWOLF CREEK
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance38.4 mi
Fiber providers6
Fiber coverage97.6%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance428.6 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCHOCTAW COUNTY GENERATING STATION
Hazard sub-score45/100
Construction cost index53.6 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance38.4 mi
Nearest rail11.2 mi
Nearest gas pipeline7.3 mi
Nearest fiber route35.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.65¢/kWh
Industrial electricity7.48¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,144

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
48
Fiber connectivity12%
67
Energy cost10%
89
Water risk8%
90
Natural hazard8%
45
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
100
Gas pipeline2%
77
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Choctaw County, ranked by DC Readiness.

Sites near WOLF CREEK
SiteTypeVoltageCapacityQueue waitScore
FRENCH CAMPSubstation-Adjacent500 kV1,000 MW1.4 yrs76.4
Greenfield (UNKNOWN109619 - WESTPOINT)Greenfield500 kV1,000 MW1.4 yrs71.0
UNKNOWN109367Substation-Adjacent161 kV100 MW1.4 yrs69.7
Greenfield (UNKNOWN109619 - WESTPOINT)Greenfield500 kV1,000 MW1.4 yrs69.6
Greenfield (UNKNOWN109619 - FRENCH CAMP)Greenfield500 kV1,000 MW1.4 yrs67.8
RED HILLS GENERATING FACILITYSubstation-Adjacent161 kV100 MW1.4 yrs67.3
TAP144785Substation-Adjacent161 kV100 MW1.4 yrs63.7
Greenfield (TAP144783 - STURGIS)Greenfield161 kV100 MW1.4 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOLF CREEK, Choctaw County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.