Eastern Shore Conservation Center

Industrial

Talbot, Maryland · PJM

DC Readiness
41.6
Fair / 100

Eastern Shore Conservation Center is a industrial datacenter candidate site in Talbot, Maryland, interconnecting through PJM. It screens at 41.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth304

Connectivity

Nearest IXPAiNET MD-790R
IXP distance38.1 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCyberNAP Glen Burnie
DC distance38.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity12.95¢/kWh
Industrial electricity11.36¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$9,250

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Talbot, ranked by DC Readiness.

Sites near Eastern Shore Conservation Center
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123232Substation-Adjacent138 kV100 MW3.1 yrs65.9
EC Near EastonGreenfield3.5 yrs58.5
EastonBrownfield3 MW3.5 yrs58.5
EC Near EastonGreenfield3.5 yrs58.2
EC Near EastonGreenfield3.5 yrs58.0
EC Near EastonGreenfield3.5 yrs57.3
EC Near EastonGreenfield3.5 yrs57.0
EC Near EastonGreenfield3.5 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Eastern Shore Conservation Center, Talbot. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.