UNKNOWN117582

Substation-Adjacent

Wyandotte, Kansas · MISO

DC Readiness
69.6
Good / 100

UNKNOWN117582 is a substation-adjacent datacenter candidate site in Wyandotte, Kansas, interconnecting through MISO. It screens at 69.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117582
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP1530 SWIFT - NOCIX
IXP distance0.8 mi
Fiber providers10
Fiber coverage90.7%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance161.9 mi

Site characteristics

Parcel ownerKCP&L GREATER MISSOURI OPERATIONS CO.
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)2.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMIDWEST COATINGS INC
Hazard sub-score55/100
Construction cost index104.4 (avg 100)

Location context

Nearest datacenterUnReal Servers
DC distance1.0 mi
Nearest rail0.0 mi
Nearest gas pipeline4.0 mi
Nearest fiber route2.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$9,876

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
99
Energy cost10%
90
Water risk8%
52
Natural hazard8%
55
Buildability7%
100
Labor market4%
50
DC cluster4%
100
Land / acreage3%
39
Construction cost3%
63
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Wyandotte, ranked by DC Readiness.

Sites near UNKNOWN117582
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118111Substation-Adjacent161 kV100 MW3.5 yrs72.0
UNKNOWN117108Substation-Adjacent161 kV100 MW3.5 yrs71.4
UNKNOWN149375Substation-Adjacent161 kV100 MW3.5 yrs71.3
UNKNOWN117434Substation-Adjacent161 kV100 MW1.4 yrs71.3
UNKNOWN118073Substation-Adjacent161 kV100 MW3.5 yrs71.2
UNKNOWN117624Substation-Adjacent161 kV100 MW3.5 yrs71.0
UNKNOWN117547Substation-Adjacent161 kV100 MW3.5 yrs70.9
UNKNOWN155810Substation-Adjacent161 kV100 MW3.5 yrs70.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117582, Wyandotte. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.