Skip to content
Gridcensus

Datacenter Sites in VANDERBURGH, Indiana

VANDERBURGH has 215 scored datacenter candidate sites averaging 58.2/100 DC Readiness, with a catalogued aggregate of 1,364 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

215
Candidate sites
58.2/100
Avg DC Readiness
1,364 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in VANDERBURGH

Site-selection context for VANDERBURGH

Yessales_tax_exemption
Datacenter tax incentive
15.68¢/kWh
Commercial electricity
8.56¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$7,553
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in VANDERBURGH

Top datacenter sites in VANDERBURGH
SiteTypeVoltageCapacityQueue waitScore
BROWN (345 KV)Substation-Adjacent345 kV600 MW3.8 yrs68.3
EC Near Northeast (IN)Greenfield3.0 yrs63.7
EC Near Northeast (IN)Greenfield3.0 yrs63.6
OZ VanderburghGreenfield3.0 yrs63.3
UNKNOWN127557Substation-Adjacent138 kV100 MW3.8 yrs63.2
EC Coal Vanderburgh CountyGreenfield3.0 yrs62.6
EC Near Broadway (IN)Greenfield3.0 yrs61.8
HEIDELBACHSubstation-Adjacent138 kV100 MW3.8 yrs60.5
PIGEON CREEK TRANSSubstation-Adjacent138 kV100 MW3.8 yrs60.4
UNKNOWN127568Substation-Adjacent138 kV100 MW3.8 yrs60.4
EC Near Northeast (IN)Greenfield3.0 yrs60.0
ANGEL MOUNDSSubstation-Adjacent138 kV100 MW3.8 yrs60.0
EC Near Northeast (IN)Greenfield3.0 yrs59.9
UNKNOWN127558Substation-Adjacent138 kV100 MW3.8 yrs59.9
UNKNOWN127569Substation-Adjacent138 kV100 MW3.8 yrs59.9
EC Coal Vanderburgh CountyGreenfield3.0 yrs59.7
UNKNOWN125561Substation-Adjacent138 kV100 MW3.8 yrs59.6
UNKNOWN127546Substation-Adjacent138 kV100 MW3.8 yrs59.5
UNKNOWN127561Substation-Adjacent69 kV50 MW3.8 yrs59.5
UNKNOWN127591Substation-Adjacent138 kV100 MW3.8 yrs59.4
UNKNOWN157758Substation-Adjacent69 kV50 MW3.8 yrs59.3
UNKNOWN157757Substation-Adjacent69 kV50 MW3.8 yrs59.3
HIRSCH ROADSubstation-Adjacent69 kV50 MW3.8 yrs59.2
TAP155995Substation-Adjacent69 kV50 MW3.8 yrs59.2
TAP155994Substation-Adjacent69 kV50 MW3.8 yrs59.2

VANDERBURGH datacenter FAQ

How many datacenter sites are in VANDERBURGH?
215 scored datacenter candidate sites, averaging 58.2/100 DC Readiness.
Does VANDERBURGH offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in VANDERBURGH?
FEMA's National Risk Index rates VANDERBURGH as "Relatively Moderate" (score 32).
What are industrial electricity rates in VANDERBURGH?
Average industrial electricity is 8.56¢/kWh and commercial is 15.68¢/kWh in VANDERBURGH.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for VANDERBURGH, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.