Datacenter Sites in MADISON, Indiana
MADISON has 131 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 4,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
131
Candidate sites
55.7/100
Avg DC Readiness
4,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for MADISON
Yessales_tax_exemption
Datacenter tax incentive
11.56¢/kWh
Commercial electricity
8.85¢/kWh
Industrial electricity
15
Fiber providers
Low
Water stress
$7,322
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in MADISON
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Madison | Greenfield | — | — | 3.0 yrs | 59.8 |
| ANDERSON | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.5 |
| UNKNOWN124022 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.4 |
| OWENS BROCKWAY, INC. (GLASS CONTAINER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.7 |
| PENDLETON | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.3 |
| MADISON COUNTY CABINETS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.3 |
| NEWCO METALS, INC. (H Q) (ALUMINUM FOUNDRIES (EXCEPT DIE-CASTING)) | Manufacturing | — | — | 3.5 yrs | 55.2 |
| UNKNOWN124021 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.1 |
| UNKNOWN127654 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.0 |
| IRVING MATERIALS, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| AMERICAN PLAYGROUND (SPORTING AND ATHLETIC GOODS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| DOVEY CORP. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| REMY INTERNATIONAL, INC. (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| ATLAS REDI-MIX, INC. (READY-MIX CONCRETE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| MEADOWBROOK | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.9 |
| KENT MACHINE, INC. (ALL OTHER MISCELLANEOUS GENERAL PURPOSE MACHINERY MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.9 |
| ANDERSON WEBSTER STREET | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.8 |
| UNKNOWN124107 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.6 |
| MAKAHOY | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.6 |
| OZ Madison | Greenfield | — | — | 3.0 yrs | 54.5 |
| MULLIN | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.5 |
| UNKNOWN156769 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.4 |
| UNKNOWN139032 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.1 |
| UNKNOWN160567 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.1 |
| ALADDIN | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.1 |
MADISON datacenter FAQ
- How many datacenter sites are in MADISON?
- 131 scored datacenter candidate sites, averaging 55.7/100 DC Readiness.
- Does MADISON offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in MADISON?
- FEMA's National Risk Index rates MADISON as "Relatively Moderate" (score 32).
- What are industrial electricity rates in MADISON?
- Average industrial electricity is 8.85¢/kWh and commercial is 11.56¢/kWh in MADISON.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MADISON, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.