NATIONAL PROCESSING CO., PLT. 3 (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING)

Manufacturing

Lake, Indiana

DC Readiness
54.6
Fair / 100

NATIONAL PROCESSING CO., PLT. 3 (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING) is a manufacturing datacenter candidate site in Lake, Indiana. It screens at 54.6/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPNETRIX - ALSIP
IXP distance16.3 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterDigital Crossroad
DC distance6.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity16.78¢/kWh
Industrial electricity6.44¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,916

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
71
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Lake, ranked by DC Readiness.

Sites near NATIONAL PROCESSING CO., PLT. 3 (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING)
SiteTypeVoltageCapacityQueue waitScore
SHEFFIELDSubstation-Adjacent345 kV600 MW2.2 yrs76.9
BLUE ISLANDSubstation-Adjacent345 kV600 MW4.6 yrs75.9
SHEFFIELDSubstation-Adjacent345 kV600 MW4.6 yrs75.4
BURNHAMSubstation-Adjacent345 kV600 MW4.6 yrs75.1
UNKNOWN122743Substation-Adjacent345 kV600 MW4.6 yrs74.4
TAP138162Substation-Adjacent345 kV600 MW4.6 yrs74.4
MUNSTERSubstation-Adjacent345 kV600 MW4.6 yrs74.3
UNKNOWN121993Substation-Adjacent345 kV600 MW4.6 yrs74.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NATIONAL PROCESSING CO., PLT. 3 (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING), Lake. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.