Medora Brick Plant is a industrial datacenter candidate site in Jackson County, Indiana, interconnecting through PJM. It screens at 42.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth56

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance29.8 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDartPoints Columbus, IN - CLU1
DC distance29.8 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.34¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,958

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
55
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jackson County, ranked by DC Readiness.

Sites near Medora Brick Plant
SiteTypeVoltageCapacityQueue waitScore
TAP169429Substation-Adjacent138 kV100 MW3.0 yrs69.2
UNKNOWN128073Substation-Adjacent138 kV100 MW3.0 yrs68.8
UNKNOWN124908Substation-Adjacent230 kV300 MW3.0 yrs68.5
TAP174241Substation-Adjacent138 kV100 MW3.0 yrs66.9
Greenfield (COLUMBUS (345KV) - BEDFORD (34)Greenfield345 kV600 MW3.0 yrs66.5
Greenfield (COLUMBUS (345KV) - BEDFORD (34)Greenfield345 kV600 MW3.0 yrs65.7
Greenfield (UNKNOWN124908 - COLUMBUS (345K)Greenfield230 kV300 MW3.0 yrs65.6
TAP140172Substation-Adjacent138 kV100 MW3.0 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Medora Brick Plant, Jackson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.