Datacenter Sites in HENDRICKS, Indiana

HENDRICKS has 63 scored datacenter candidate sites averaging 57.5/100 DC Readiness, with a catalogued aggregate of 3,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

63
Candidate sites
57.5/100
Avg DC Readiness
3,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in HENDRICKS

Site-selection context for HENDRICKS

Yessales_tax_exemption
Datacenter tax incentive
11.14¢/kWh
Commercial electricity
8.64¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$9,052
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in HENDRICKS

Top datacenter sites in HENDRICKS
SiteTypeVoltageCapacityQueue waitScore
THOMPSONSubstation-Adjacent345 kV600 MW3.8 yrs64.4
QUALITECHSubstation-Adjacent345 kV600 MW3.8 yrs61.7
AMOSubstation-Adjacent345 kV600 MW3.8 yrs60.4
OZ HendricksGreenfield3.0 yrs58.8
TAP140380Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN124374Substation-Adjacent138 kV100 MW3.8 yrs58.6
UNKNOWN124377Substation-Adjacent138 kV100 MW3.8 yrs58.2
TAP140381Substation-Adjacent138 kV100 MW3.8 yrs58.1
PLAINFIELD SOUTHSubstation-Adjacent138 kV100 MW3.8 yrs57.7
MEARS MACHINE CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing3.5 yrs56.2
DREW, INC., P. H. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing3.5 yrs56.2
PHOENIX FABRICATORS & ERECTORS, INC. (IRON AND STEEL MILLS)Manufacturing3.5 yrs56.1
MERRILL-STONE, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing3.5 yrs56.1
ACME MASKING CO., INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing3.5 yrs56.0
AQUA SYSTEMS (OTHER COMMERCIAL AND SERVICE INDUSTRY MACHINERY MANUFACTURING)Manufacturing3.5 yrs56.0
NHI MEDIA (NOT AVAILABLE)Manufacturing3.5 yrs56.0
KEYSTONE ENGINEERING & MFG. CO. (MACHINE SHOPS)Manufacturing3.5 yrs56.0
BREINER CO., INC., THE (GASKET, PACKING, AND SEALING DEVICE MANUFACTURING)Manufacturing3.5 yrs56.0
INFINITY PRODUCTS, INC. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING)Manufacturing3.5 yrs56.0
HARLAN BAKERIES, LLC (COMMERCIAL BAKERIES)Manufacturing3.5 yrs55.9
ROGERS MARKETING & PRINTING (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs55.9
UNKNOWN124384Substation-Adjacent69 kV50 MW3.8 yrs55.8
TAP156023Substation-Adjacent69 kV50 MW3.8 yrs55.8
APEX PRECISION TECHNOLOGIES, INC. (MACHINE SHOPS)Manufacturing3.5 yrs55.8
CORNERSTONE INDUSTRIES CORP. (PLASTICS MATERIAL AND RESIN MANUFACTURING)Manufacturing3.5 yrs55.8

HENDRICKS datacenter FAQ

How many datacenter sites are in HENDRICKS?
63 scored datacenter candidate sites, averaging 57.5/100 DC Readiness.
Does HENDRICKS offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in HENDRICKS?
FEMA's National Risk Index rates HENDRICKS as "Relatively Moderate" (score 32).
What are industrial electricity rates in HENDRICKS?
Average industrial electricity is 8.64¢/kWh and commercial is 11.14¢/kWh in HENDRICKS.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HENDRICKS, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.