Datacenter Sites in BROWN, Indiana

BROWN has 6 scored datacenter candidate sites averaging 60.2/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

6
Candidate sites
60.2/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 6 in BROWN

Site-selection context for BROWN

Yessales_tax_exemption
Datacenter tax incentive
13.22¢/kWh
Commercial electricity
9.62¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$7,090
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in BROWN

Top datacenter sites in BROWN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157621Substation-Adjacent69 kV50 MW3.8 yrs57.1
TAP160265Substation-Adjacent69 kV50 MW3.8 yrs56.8
ELECTRIC METAL FAB, INC. (IRON AND STEEL MILLS)Manufacturing3.5 yrs56.6
FOR BARE FEET, INC. (OTHER HOSIERY AND SOCK MILLS)Manufacturing3.5 yrs56.6
BEANBLOSSOM-SW STASubstation-Adjacent69 kV50 MW3.8 yrs56.0
UNKNOWN160377Substation-Adjacent69 kV50 MW3.8 yrs56.0

BROWN datacenter FAQ

How many datacenter sites are in BROWN?
6 scored datacenter candidate sites, averaging 60.2/100 DC Readiness.
Does BROWN offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in BROWN?
FEMA's National Risk Index rates BROWN as "Relatively Moderate" (score 32).
What are industrial electricity rates in BROWN?
Average industrial electricity is 9.62¢/kWh and commercial is 13.22¢/kWh in BROWN.