MONTPELIER ELECTRIC GENERATING STATION is a substation-adjacent datacenter candidate site in BLACKFORD, Indiana, interconnecting through PJM. It screens at 65.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in BLACKFORD, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (MONTPELIER ELECTRIC GENERATING) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 59.2 |
| VAN BUREN | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 54.7 |
| Greenfield (UNKNOWN124109 - DESOTO) | Greenfield | 138 kV | 100 MW | 3.0 yrs | 54.0 |
| 3M CO. (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING) | Manufacturing | — | — | — | 48.6 |
| KEY PLASTICS, LLC (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | — | 48.6 |
| CADENCE INNOVATION, LLC (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | — | 48.6 |
| INDIANA VENEER PRODUCTS CORP. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING) | Manufacturing | — | — | — | 48.6 |
| EMHART TEKNOLOGIES (FASTENER, BUTTON, NEEDLE, AND PIN MANUFACTURING) | Manufacturing | — | — | — | 48.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MONTPELIER ELECTRIC GENERATING STATION, BLACKFORD. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.