UNKNOWN123976

Substation-Adjacent

BENTON, Indiana · PJM

DC Readiness
60.2
Good / 100

UNKNOWN123976 is a substation-adjacent datacenter candidate site in BENTON, Indiana, interconnecting through PJM. It screens at 60.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN123976
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPWintek Corporation
IXP distance28.0 mi
Fiber providers5
Fiber coverage68.9%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterAgricultural and Biological Engineering
DC distance26.7 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity16.83¢/kWh
Industrial electricity6.26¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$10,011

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
33
Fiber connectivity12%
42
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in BENTON, ranked by DC Readiness.

Sites near UNKNOWN123976
SiteTypeVoltageCapacityQueue waitScore
TAP138288Substation-Adjacent345 kV600 MW3.8 yrs61.5
UNKNOWN123978Substation-Adjacent345 kV600 MW3.8 yrs61.1
UNKNOWN123975Substation-Adjacent345 kV600 MW3.8 yrs60.6
UNKNOWN123977Substation-Adjacent345 kV600 MW3.8 yrs59.8
KERKHOFF ASSOCS., INC. (TRUSS MANUFACTURING)Manufacturing3.5 yrs56.3
ROWE TRUCK EQUIPMENT, INC. (MOTOR VEHICLE BODY MANUFACTURING)Manufacturing3.5 yrs56.3
DRUG PLASTICS & GLASS CO., INC. (PLASTICS BOTTLE MANUFACTURING)Manufacturing3.5 yrs54.8
WHISKEY BARREL PLANTERS (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN123976, BENTON. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.