Former Magnum Metal Finishing Property
IndustrialOgle, Illinois · PJM
Former Magnum Metal Finishing Property is a industrial datacenter candidate site in Ogle, Illinois, interconnecting through PJM. It screens at 45.2/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Ogle, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BYRON | Substation-Adjacent | 345 kV | 600 MW | 2.2 yrs | 75.2 |
| TAP137919 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 70.3 |
| Greenfield (BYRON - TAP137909) | Greenfield | 345 kV | 600 MW | 2.2 yrs | 67.1 |
| Greenfield (BYRON - EASY ROAD) | Greenfield | 345 kV | 600 MW | 2.2 yrs | 66.5 |
| UNKNOWN124268 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 66.0 |
| Greenfield (BYRON - EASY ROAD) | Greenfield | 345 kV | 600 MW | 2.2 yrs | 65.9 |
| TAP137920 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 65.4 |
| EC Near South Main Street | Greenfield | — | — | 4.6 yrs | 63.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen