Broward County, Florida · SERC

DC Readiness
65.5
Good / 100

BEVERLY is a substation-adjacent datacenter candidate site in Broward County, Florida, interconnecting through SERC. It screens at 65.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBEVERLY
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Miami (EDCMIA02)
IXP distance4.2 mi
Fiber providers13
Fiber coverage63.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance497.2 mi

Site characteristics

Parcel ownerFLORIDA POWER & LIGHT CO
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteACURA
Hazard sub-score35/100
Construction cost index94.3 (avg 100)

Location context

Nearest datacenterEdgeConneX Miami (EDCMIA02)
DC distance4.2 mi
Nearest rail2.9 mi
Nearest gas pipeline2.1 mi
Nearest fiber route182.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.93¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$35,434

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
75
Fiber connectivity12%
45
Energy cost10%
89
Water risk8%
84
Natural hazard8%
35
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
38
Construction cost3%
71
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Broward County, ranked by DC Readiness.

Sites near BEVERLY
SiteTypeVoltageCapacityQueue waitScore
OAKLAND PARKSubstation-Adjacent230 kV300 MW3.6 yrs76.8
DEERFIELD BEACHSubstation-Adjacent230 kV300 MW3.6 yrs76.3
WOODLANDSSubstation-Adjacent230 kV300 MW3.6 yrs75.9
UNKNOWN108642Substation-Adjacent230 kV300 MW3.6 yrs75.8
DELMARSubstation-Adjacent230 kV300 MW3.6 yrs75.8
BUTTSSubstation-Adjacent230 kV300 MW3.6 yrs75.6
SPRINGTREESubstation-Adjacent230 kV300 MW3.6 yrs75.1
HIATUSSubstation-Adjacent230 kV300 MW3.6 yrs74.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEVERLY, Broward County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.