EUREKA SPRINGS

Substation-Adjacent

Carroll County, Arkansas · ERCOT

DC Readiness
60.3
Good / 100

EUREKA SPRINGS is a substation-adjacent datacenter candidate site in Carroll County, Arkansas, interconnecting through ERCOT. It screens at 60.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationEUREKA SPRINGS
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance36.8 mi
Fiber providers4
Fiber coverage19.3%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance306.9 mi

Site characteristics

Parcel ownerENTERGY ARKANSAS INC
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index62.6 (avg 100)

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance36.8 mi
Nearest rail14.1 mi
Nearest gas pipeline2.1 mi
Nearest fiber route70.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.01¢/kWh
Industrial electricity6.97¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,992

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
55
Fiber connectivity12%
45
Energy cost10%
92
Water risk8%
86
Natural hazard8%
62
Buildability7%
45
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
98
Gas pipeline2%
93
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Carroll County, ranked by DC Readiness.

Sites near EUREKA SPRINGS
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN107946Substation-Adjacent161 kV100 MW3.4 yrs63.8
UNKNOWN117688Substation-Adjacent161 kV100 MW3.4 yrs63.5
UNKNOWN107941Substation-Adjacent161 kV100 MW3.4 yrs62.8
TABLE ROCK DAM POWER STATIONSubstation-Adjacent161 kV100 MW3.4 yrs62.3
TAP154694Substation-Adjacent161 kV100 MW3.4 yrs62.1
TAP154693Substation-Adjacent161 kV100 MW1.4 yrs61.0
UNKNOWN121678Substation-Adjacent161 kV100 MW3.4 yrs59.6
UNKNOWN107943Substation-Adjacent161 kV100 MW3.4 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EUREKA SPRINGS, Carroll County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.