Choctaw, Alabama · MISO

DC Readiness
55.2
Good / 100

TAP143462 is a substation-adjacent datacenter candidate site in Choctaw, Alabama, interconnecting through MISO. It screens at 55.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP143462
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth13
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance100.1 mi
Fiber providers5
Fiber coverage40.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance479.6 mi

Site characteristics

Parcel ownerALABAMA POWER CO
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.40
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteTRANSCONTINENTAL GAS PIPE LINE COMPANY LLC 84 21 VALVE SITE
Hazard sub-score20/100
Construction cost index89.8 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance100.1 mi
Nearest rail6.3 mi
Nearest gas pipeline2.3 mi
Nearest fiber route73.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.55¢/kWh
Industrial electricity9.50¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$2,456

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
60
Fiber connectivity12%
54
Energy cost10%
85
Water risk8%
82
Natural hazard8%
20
Buildability7%
15
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
75
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
20

Nearby comparable sites

Other scored datacenter candidate sites in Choctaw, ranked by DC Readiness.

Sites near TAP143462
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110562Substation-Adjacent115 kV100 MW1.4 yrs62.7
OZ ChoctawGreenfield3.7 yrs56.9
Greenfield (TAP143461 - TAP143462)Greenfield115 kV100 MW1.4 yrs55.1
EC FFE Choctaw CountyGreenfield3.7 yrs51.7
Lisman Junior High SchoolIndustrial46.5
Mine SiteFormer Mine45.7
Lisman Junior High SchoolIndustrial45.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143462, Choctaw. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.